Because of a need for parents with children playing ball, new playground equipment will be installed next month at Ellis Park, 1105 E. 12th Street on Fort Scott’s east side.
“We decided to install play equipment at this area to help encapsulate a full-family entertainment experience at Ellis Park,” Lucas Kelley, Buck Run Community Center Manager said.
“Parents/older siblings are often entertained by watching or playing a game on one of these two fields,” he said. “However, many times siblings/other children are not too excited to sit in the bleachers and watch a game. This allows them to have a fun experience while they are there.”
The playground area will be by the basketball/volleyball court at Ellis Park, near the ballfields.
“We felt as if the play structure would get more use right next to the main attraction,” he said. “As a parent, I would not feel comfortable with my kids being on the opposite end of the park, where I would not be able to see them. This location allows for both easier access and parent comfortability of being able to watch all of their kids at once.”
The Fort Scott Recreation Department will fund the equipment through the renewal of Fisher Park Advertising Signs, 5Ks races, sports photos, and the Steele Foundation Money that is received yearly, said Kelley.
“The play structure is called Sunset Harbor from Recreation Installations out of Kansas City,” he said. “This play structure will include three slides total, one wave slide on one side and a double wave slide on the other. It also includes a pod climber, rain wheel, single drum, and a set of monkey bars.”
“The play structure is on pace to start installation the week of November 14th, and should be completed by the end of the month.” he said.
“We have tentative plans to find either a shade structure or cover for this play area, to help protect children from foul balls. However, we have not decided which option we would like to add yet,” Kelley said.
The Recreation Department has completed two projects this year.
“Our two main projects for this year were to resurface the outdoor basketball court at BRCC, and to add a play structure at Ellis. I am happy to say we were able to get both of those projects done before the new year!”
“Looking ahead we will try to improve/add an aspect of our reach each year,” he said. “In the spring, the hope is to resurface the outdoor basketball courts at Ellis and 3rd Street Park. These projects will depend on where we sit budgetary-wise at that point. If anyone has any project ideas/suggestions please feel free to email [email protected] or call (620)-223-0386