The original scan posted of the payment plan documents had 140 contracts. I mentioned at that time that there were some documents that may have double fed into the scanner as I had been billed for 143 documents. After going back through and double checking for anything that hadn’t made it to the posted PDF, I added eight more contracts bringing the total number to 148.

I apologize for the error and want to stress that it was an issue with scanning on my end of things–not something on the county side. You can download the corrected PDF using the link below.

PDF of Payment Plan Contracts

Susan emailed me to clarify why many of the contracts were not signed. Many were handled through the mail and people didn’t sign and return them after they were received. As long as the payment plan wasn’t letting people do anything that they couldn’t have done on their own, it really didn’t make a difference if they were signed or not. It may have helped people schedule out their payments, but that wasn’t something people couldn’t have done for themselves.

Exit mobile version